Services Themes

Central company courtyard including social- and administration building, with central workshop, halls for special purpose vehicles, garages, storages, grit storages of the waste-management of Chemnitz

STRUCTUAL ENGINEERING

includes five principal areas:

  • work shop and vehicle halls
  • social building
  • entrance building
  • winter-maintenance hall
  • petrol station


work shop and vehicle halls

  • the entire hall complex was founded in 1975 in EMZG-construction (concrete frame   construction- system building)
  • the six aisle compact building is divided into the following parts
    • hall 1 and 2 including extension north
    • breaker
    • hall 3 and 4 including extension south
    • lateral hall
    • conversion in vehicle parking place halls and work shop complex
  • partial replacement of the concrete wall panel by coffered slab including window unit, the fixing of the coffers will be effected by steel angles, beeing connected with the columns by steel slabs
  • two-storey installation as a concrete frame construction including masonry infilling next to the washing hall, establishment on isolated foundation
  • installation of masonry installations for storage and work shops, as well as a room-high fire-resisting wall for the tire storage (separate fire cell)
  • demolition of the bridge cranes in all of the halls, the crane beams have been preserved   for stabilization of the columns
  • installation of repair working pits
  • installation of large ribbon windows including RWA-installations for lighting and smoke outlet an event of a fire
  • installation of a two-storey office building as masonry building including steel girder roof and trapezoidal covering in the area of a demolished mixing tower


social building

  • five-storey construction including total basement in 2 Mp-method according to catalogue IG 65-series - no intervention in the structural system of the building


entrance building

  • single storey masonry building including octagonal ground plan
  • foundation by an uninterrupted strip foundation, isolated foundation under central support
  • roof structure as a tent shaped dome roof made of couple closed construction including   titanium-zinc roofing

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
Overall planning and Supervision of construction

Client:
Grundstücks- und Gebäudewirtschafts-Gesellschaft mbH Chemnitz

Costs:
20.000 T€