Services Themes

New Design of a Landfill / Long-term Interim Storage Facility at the Abandoned Quarry Freiheit III

The Mitteldeutsche Sanierungs- und Entsorgungsgesellschaft mbH intends to create a storage facility for waste on the site of the Abandoned Quarry Freiheit III. Initially, a landfill was planned. Later on the design of an interim storage facility was decided on.

- Construction of the landfill / interim storage contact area, incl. the necessary barriers
- Base sealing
- Design of the deposition contour, determination of the disposal volume
- Division of the disposal area into economic construction stages
- Top sealing incl. Facilities for surface water catchment
- Planning of ancillary facilities, e.g. entrance area, access/bypasses/access roads, rainwater detention basin and leachate treatment facility

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
Project Management
Preparation of Handout Scoping Meeting
Site planning of civil engineering structures, HOAI stages 1-4 German Fee Structure for Architects and Engineers
Preparation / Supervision of further expert services (EIA, subsoil investigation, surveying etc.) 
Site Investigation and Foundation Work Consultancy 
Seettlement Consultancy

2012 - 2016

Client:
MDSE Mitteldeutsche Sanierungs-
und Entsorgungsgesellschaft mbH
Alu-Straße 1
06749 Bitterfeld-Wolfen

Overall Costs:
60 Mio. €