Services Themes

Nature-orientated Water body Improvement „Mühlgraben Merseburg“

- nature-orientated water body and embankment design

- demolition of two reinforced concrete bridges

- replacement reconstruction of a bridge by a dam including Hamco-culverts

- replacement construction of a drop level building by a riverbed ramp

- clearing and removal of approx. 1.500 m³ of sediment

- creation of a 5-metres-high gabion wall

CERTIFICATES

The C&E Consulting and Engineering GmbH Chemnitz is certified according to DIN EN ISO 9001:2015.

Other certifications and approvals

DETAILS

Services:
Design of Civil Engineering works, HOAI stages 1-8 German Fee Structure for Architects and Engineers
Structural Engineering, HOAI stages 1-6
Hydrological-water management investigations
Geological and subsoil assessment
Data of the structure of the culvert
Ecological assessment
Information of legal framework
Designation of the preferred option incl. cost estimation and construction sequence
Preparation of documents for the planning approval
Official approval of plans
Supervision of works

2012 - 2015

Client:
City of Merseburg
Lauchstädter Straße 1 – 3
06217 Merseburg

Costs:
1.500 T€